How to Tech Inspect a Motor

So as an ongoing topic of discussion it’s been noted that not everyone knows how to do a pre-tech inspection on their own motors. Well everyone here at Tekin is here to help, as always. Here’s how to do a tech inspection on the mechanical aspects of a 17.5 motor. For now we’re going to keep it about the physical mechanicals of the motor which anyone can do with a pair of digital calipers.

20150429_143201

 

Step 1: A few quick measurements are the overall diameter of the motor which must be 36.02mm or under at the largest point of the motor, and the length which must be under 53.00mm measured from the mounting face to the furthest point of the rear endbell not including solder tabs, lead wire, or mfg’s logo or name. tear down the motor. For a Tekin Redline Gen2 we simply remove the 3 3/32nd screws from the front endbell ,remove the endbell and phenolic washer set these aside.

20150429_143201 20150429_143714

 

 

 

 

 

 

Next careful remove the rotor from the body of the motor. This can be difficult and take some practice and patience. Use a pair of plyers or put a pinion gear back on the rotor shaft to assist in removal which is what I do. Whatever you do don’t let go of it while it’s half way out and allow it to “slap” back into the sensor board. On a Tekin Redline Gen2, you can remove the rear endbell and sensor board to prevent this from happening, as well as disassemble the motor from this direction as well, again preventing any damage.

20150429_145735 20150429_145747

 

 

 

 

 

 

 

 

 

Next you can measure the inside “bore” of the motor which should be able to accept a “‘go-no-go’ gauge 14.500 +0.000/-0.005 mm diameter shall pass into the stator, clearing the stator plus its windings and the electrical collection ring at the end of the stator.” ROAR Rule 8.5.4.2

20150429_143754

 

 

 

 

 

 

Next up is measuring the stack. “The overall stator length parallel to the motor shaft shall be minimum length 19.3mm, maximum 21.0mm.” **Note that this rule was recently re-added  to the ROAR rule book(recently announced) and has been in the IFMAR rule book for some time.

20150429_14341420150429_143634

 

 

 

 

 

 

Now the Tekin Redline Gen2 comes in both a “Standard” or torque version, as well as a “RPM” version with a shorter stack. Both are measured in the “windows” on the side of the can. As you can see it’s easy to measure on the Redline Gen2 without disassembly.

Last but not least is measuring the rotor, Rule 8.5.4.4.2. There are a few key areas to look for starting with the “OD” or outside diameter of the rotor magnet body. Now for 17.5 ROAR Spec “the magnet outside diameter shall be a maximum of 12.51 mm, no tolerance, for the entire length of the magnet.”  “The magnet length shall be 25.0 +/- 1.00mm not including any non-magnetic balancing material.”  Also don’t overlook the shaft outside diameter where the magnet material is mounted which “shall be 7.25 +/- 0.150mm for the entire length of the magnet. This dimension must be measurable without destroying the rotor.”

20150429_143856 20150429_143952

 

 

 

 

 

 

20150429_162429

 

 

 

 

 

 

That’s pretty much it.  After this you really need to get a MMS or resistance meter to begin verifying wire diameter, missing winds, etc. Note that an inductance meter is currently used by the sanctioning bodies and will verify “wind” count but cannot catch illegal wire such as those motors made to be “outlaw” style motors which are often spec’d with oversized illegal wire.

Comments are closed.